What is G99?
The Indian standard for connecting generation equipment, such as CHP systems and generators, to the public electrical grid is G99. In order to guarantee safety, stability, and dependability when integrating with the grid, it lays out operational and technical requirements.
Why G99 Compliance Matters
Failure to comply with G99 can result in:
-
Delayed grid connection
-
Increased costs
-
Risk of disconnection or fines
Our team ensures full compliance from design through commissioning, giving you peace of mind and uninterrupted power.

Our G99 Services

-
Application Support
We manage the entire G99 application process with your Distribution Network Operator (DNO).
-
Technical Compliance
Detailed engineering checks to meet voltage, frequency, and protection requirements.
-
Documentation & Testing
Complete paperwork and on-site testing for certification.
-
End-to-End Project Management
From initial design to final approval, we handle everything.